Skip to content

For every operation where machines run.

Crane 3 in the port, mill 3 in the plant: the crew re-plans, you approve. The ship stays on time.

20 minutes with a co-founder. Free, no commitment.

Maintenance

Crane 3 makes 26 instead of 30 moves an hour. Check the brake at the 10 am stop.

Cargo handling

If crane 4 takes bay 12, the ship is done at 6 pm as planned. Otherwise at 7:30 pm.

Yard

Block C has 380 slots free. The train picks up at 8 pm.

You

Approved. Crane 4 takes over.

Every message ends with your yes.

Complaints: 3 pallets stay on site
Quality

Customer report: burr on batch 2291. Three pallets of the same batch are still in dispatch.

Warehouse

The three pallets are blocked as soon as you approve.

You

Approved. Batch 2291 stays on site.

Downtime: 0 minutes until 4 pm
Maintenance

The tool on mill 3 is at 92 % of its life. The replacement tool is only set up at 4 pm.

Quality

With 10 % less feed this tool lasted 5 hours longer last week, every part in tolerance.

Shift lead

Approval 1 of 2: feed minus 10 % until 4 pm.

You

Approval 2 of 2. The mill runs until the change.

Overtime: no Saturday shift
Purchasing

The material for order 5120 only arrives tomorrow at 7 am.

Production

Order 5134 has everything. Brought forward, the line keeps running; otherwise it would stand from 3 pm and we would need Saturday.

You

Approved. Bring 5134 forward, no Saturday.

See what is possible in your operation.

20 minutes with a co-founder. Free, no commitment.

Check this for my operation

Or directly: ben@getadvantage.app · marc@getadvantage.app