Crane 3 makes 26 instead of 30 moves an hour. Check the brake at the 10 am stop.
If crane 4 takes bay 12, the ship is done at 6 pm as planned. Otherwise at 7:30 pm.
Block C has 380 slots free. The train picks up at 8 pm.
Approved. Crane 4 takes over.
Solutions
For every operation where machines run.
Crane 3 in the port, mill 3 in the plant: the crew re-plans, you approve. The ship stays on time.
20 minutes with a co-founder. Free, no commitment.
Crane 3 makes 26 instead of 30 moves an hour. Check the brake at the 10 am stop.
If crane 4 takes bay 12, the ship is done at 6 pm as planned. Otherwise at 7:30 pm.
Block C has 380 slots free. The train picks up at 8 pm.
Approved. Crane 4 takes over.
More cases
Every message ends with your yes.
Customer report: burr on batch 2291. Three pallets of the same batch are still in dispatch.
The three pallets are blocked as soon as you approve.
Approved. Batch 2291 stays on site.
The tool on mill 3 is at 92 % of its life. The replacement tool is only set up at 4 pm.
With 10 % less feed this tool lasted 5 hours longer last week, every part in tolerance.
Approval 1 of 2: feed minus 10 % until 4 pm.
Approval 2 of 2. The mill runs until the change.
The material for order 5120 only arrives tomorrow at 7 am.
Order 5134 has everything. Brought forward, the line keeps running; otherwise it would stand from 3 pm and we would need Saturday.
Approved. Bring 5134 forward, no Saturday.
See what is possible in your operation.
20 minutes with a co-founder. Free, no commitment.
Check this for my operationOr directly: ben@getadvantage.app · marc@getadvantage.app