Skip to content

Physical AI for your operation.

getAdvantage brings harvest, quality and storage into one AI crew. When rain is coming, it works through field, grain moisture and silo with your operating data and puts the plan in front of you. You approve with one word.

20 minutes with a co-founder. Free, no commitment.

Harvest

Rain from 4 pm. Field 7 is done by 3:20 pm if we keep going.

Quality

Grain moisture 14.2 %. Goes into the silo without drying.

Storage

Silo 3 has 180 t free. The second cart is here in 4 minutes.

You

Approved. We keep going.

Benjamin HellmichBenjamin HellmichCo-Founder
Marc LindnerMarc LindnerCo-Founder
Dr. Syed Fawad AliDr. Syed Fawad AliCo-Founder

The bars are still in tolerance. You act anyway.

Quality sees the trend, production the window, maintenance the swap. You approve before scrap is made.

Quality

Waviness is rising. Still in tolerance, at this trend it hits the limit around 4 pm.

Production

Lot 4471 is done at 1:40 pm. After that we have 30 minutes free.

Maintenance

Roller 4 runs 9 °C hotter. The swap takes 25 minutes, the spare is on shelf B4.

You

Approved. Swap roller 4 after the lot.

Crane 3 slows down. The ship stays on time.

Maintenance, cargo handling and yard re-plan before the berth time grows.

Maintenance

Crane 3 makes 26 instead of 30 moves an hour. Check the brake at the 10 am stop.

Cargo handling

If crane 4 takes bay 12, the ship is done at 6 pm as planned. Otherwise at 7:30 pm.

Yard

Block C has 380 slots free. The train picks up at 8 pm.

You

Approved. Crane 4 takes over.

HOW TO GET STARTED

In 24 hours, know what's possible in your operation.

You send exports. After 24 hours you see where your operation loses out, which agents help and where to start. The first analysis is free.

From SAP, MES and Excel exports and the shift log.

No IT project · No personal data · Servers in Frankfurt

Your plant findingsafter 24 hours

Three places where your plant is losing.

From your exports, with a source for every finding.

  1. 1
    QUALITY

    Scrap after clamping stops on Press 14

    Recommended: Quality + Maintenance

    Scrap rate ↓
  2. 2
    WAREHOUSE

    Missing parts before early dispatch

    Recommended: Warehouse + Purchasing

    On-time delivery ↑
  3. 3
    MAINTENANCE

    Downtime until the tool change

    Recommended: Maintenance

    OEE ↑
ROADMAPWeek 2: first cases. From month 3: at the machine.

FROM THE EXAMPLES ABOVE

Every approval moves a KPI.

Scrap0 bars

out of tolerance, instead of scrap from 4 pm. Roller 4 is swapped before.

Downtime0 min

unplanned. The swap takes 25 of the 30 free minutes after lot 4471.

On-time delivery90 min

earlier: done at 18:00 instead of 19:30. Crane 4 takes bay 12.

AT THE MACHINE

No machine command without your yes.

In systems one approval is enough. At the machine two people approve. Emergency stop and guards stay in your controller.

How every machine stays safe →
Maintenance

Lot 4471 is done at 13:40. Stop at cycle end to swap roller 4?

Shift lead

Approval 1 of 2.

You

Approval 2 of 2. Stop at cycle end.

Restart on site only.

We bring the crew to your plant.

Benjamin HellmichBenjamin HellmichCo-Founder
Marc LindnerMarc LindnerCo-Founder
Dr. Syed Fawad AliDr. Syed Fawad AliCo-Founder

Book a call

20 minutes with a co-founder. Free and without obligation.

Loading free times …

By booking you agree to our privacy policy.