Lot 4471 is done at 13:40 and in tolerance. Then swap roller 4.
The shift lead has approved, 1 of 2. Stop at cycle end at 13:40.
Spare roller from B4 is ready. Swap 25 minutes, restart on site.
Approval 2 of 2. Stop at cycle end.
Safety
No command without a person's yes.
At the machine two people approve. Emergency stop and guards stay in your controller.
20 minutes with a co-founder. Free, no commitment.
Lot 4471 is done at 13:40 and in tolerance. Then swap roller 4.
The shift lead has approved, 1 of 2. Stop at cycle end at 13:40.
Spare roller from B4 is ready. Swap 25 minutes, restart on site.
Approval 2 of 2. Stop at cycle end.
Approval
Three levels. You set them.
- 01One approval in your systems.Reserve material, bring an order forward.
- 02Two approvals at the machine.Stop at cycle end, change recipe, adjust feed.
- 03Locked.Safety functions and remote restart.
At the machine
Three fixed rules at every machine.
- 01Emergency stop and safety functions stay in your controller. No change to the PLC logic. Restart on site only.
- 025 seconds to cancel, as long as the command has not run.
- 03Every approval on record: who, what, when. For the shift, quality and audits.
Walk through the approvals for your plant with us.
20 minutes with a co-founder. Free, no commitment.
Walk through approvals for my plantOr directly: ben@getadvantage.app · marc@getadvantage.app